Stakeholder Circle Upgrade Launched

The Stakeholder Circle® is the premier methodology and tool set for analyzing the stakeholder community around a business activity, or a project. The primary tool for implementing the Stakeholder Circle® methodology, is the Stakeholder Work Sheet (SWS). The latest upgrade now includes:

  1. The Stakeholder Circle® report as an integrated, fully automatic, capability
  2. Greater control over the prioritization calculations, you can balance power, proximity, and urgency to suit your environment
  3. Enhanced engagement assessment
  4. The stakeholder engagement index to track changes in the average stakeholder attitudes over time
  5. An integrated on-line help capability linked from each tab of the spreadsheet

Two version of the tool, a 100-stakeholder version and a 1000-stakeholder version.

You are invited to download the enhanced sample version of the spreadsheet from https://mosaicprojects.com.au/shop-stakeholder-worksheet.php  (there is no longer a requirement to register before downloading). The sample version allows the first 5 stakeholders to be edited and all of the macros to run.

For more information see: https://mosaicprojects.com.au/PMKI-SHM-030.php

Leave a comment